Construction of 7 Bedroom House, Maddu, Gomba District
- Home
- Lq-project
- Construction of 7 Bedroom House, Maddu, Gomba District
Project Summary
Project:
Construction of 7 Bedroom House
Client:
Frank Mugaluyire
Location:
Maddu, Gomba District
Work Scope:
General Building Construction
Value:
410,532,700/=
Project Period:
120 Days
Completion:
April 2019
About Project
This project brought a spacious 7-bedroom home to life by merging innovative design with high-quality construction. SCL applied its design-build expertise to create a sustainable, comfortable residence using natural materials and efficient planning. The architectural approach focused on maximizing living space while maintaining a harmonious balance with local construction practices.
The project was completed within 120 days, exemplifying SCL’s ability to balance tight scheduling with superior craftsmanship. Every facet—from preconstruction planning to final finishes—was managed meticulously to deliver a home that meets modern standards and uplifts the local community.
The project was completed within 120 days, exemplifying SCL’s ability to balance tight scheduling with superior craftsmanship. Every facet—from preconstruction planning to final finishes—was managed meticulously to deliver a home that meets modern standards and uplifts the local community.
Brochure
Download our document to see specific data of the service and how we work.
PROJECTS BROCHURE.PDF
5.81M
Let’s Start Work
Together
Please feel free to contact us. We will get back to you with 1-2 business days. Or just call us now.
256 779 902529
256 772 347352


